AsklingDocs

The Runs and schedules page and the runs list

What it does

The page Runs and schedules shows one card per feature and a table of recent runs. Times are in your workspace time zone.

  • This week shows when each feature ran and runs next.
  • One row per feature (Data quality, Duplicates, Enrichment and ICP analysis), closed to start with.
  • Auto mode box says which checks are Live, in Shadow or off.
  • Recent runs lists the latest runs with their numbers.

This week

A row for each feature that has a schedule or ran this week, and a column for each day, Monday to Sunday. Today is shaded. A feature with no schedule and no run this week has no row.

  • Filled chip with a tick: ran, with the start time. Scheduled runs and runs you started yourself both show here.
  • Red chip with a cross: failed.
  • Outlined chip: planned by the schedule.
  • Amber Skipped chip: the scheduled run did not start. It says why, for example paused, trial ended or HubSpot disconnected. A skip for the AI allowance shows in Recent runs.
  • Heading line: Next Enrichment tomorrow 02:00 names the next planned run. When your workspace time zone is not your browser's, the card says it once, for example Times in Eastern time.

A closed feature row

  • the feature name with its icon,
  • its schedule in plain words: Daily at 06:00, Weekly on Monday at 06:00 or No automatic run,
  • its last run: a tag (Done, Partly done, Failed) with the time, or the progress bar while it runs, or No run yet,
  • its next run, such as Next tomorrow 06:00.

A feature whose last run failed has a red edge and the tag Failed with the check named. A problem never hides behind a click. Click the row (or press Enter or Space on it) to open the card. Which rows you opened stays while you use Askling in this browser tab.

Two checks are not red:

  • Waiting for access: HubSpot refused the check because of your plan or a permission you still have to enable. The row shows the newest run that did go through.
  • Switched off · not in your HubSpot plan: an admin switched the check off with Not in my plan because the HubSpot plan has no workflows. It stays grey until an admin clicks Turn back on on the Workflows tab.

An open card holds

  • one line: the next run, such as Next run Monday 06:00 · 5 of 6 checks, or No automatic run, or Paused: suggestions only,
  • Run all now, which starts every included check,
  • one row per check. It has a tick for included in the schedule, the check name and a small Run now.
  • On each check row: its estimate (≈ 30 companies · ≈ 1 min, from the last five finished runs) and its last run (Today 06:00 · Done, No run yet or Running… started 07:02),
  • one schedule for the whole card (Off, Daily, Weekly or Monthly, with a time) and one Save. See Schedules.

The Auto mode box sits under the feature rows, with one line and the link Open Auto mode. The line lists the checks per mode, for example Live: Enrichment · Shadow: Domain format, or Off for every check.

  • Nothing approved on its own. A bold first sentence says so: Pause all is on., The kill switch is on. or Your trial ended.
  • Paused checks. Checks that were Live are listed under Paused. An admin resumes it. See Stopping auto mode.

Recent runs shows the latest five runs, newest first. Click Show all and the number to see up to 30, and Show fewer to go back. The columns are:

ColumnMeaning
StatusQueued, Running, Done, Partly done, Failed, Skipped: paused, Skipped: AI allowance used up, Cancelled, with the check name. It also shows how the run started: Schedule, Run now, Setup or Retry
StartedWhen it began
TookHow long it ran
ScannedCompanies read
CreatedNew suggestions made
CollisionsMessy domains that match another company and so got no suggestion. See Domain collisions
Fixed in HubSpotOpen items closed because someone fixed them in HubSpot. See Items fixed in HubSpot
NotesThe reason a run failed, in words, or a note such as paused: suggestions only

A value Askling does not know is an empty cell, never 0. Collisions, Fixed in HubSpot and Notes show only when a run has a value for them.

How to use it

You need first

  • Profile: Admin or Non admin to start runs. Everyone can read the page.
  • Know this: a run only reads HubSpot and prepares suggestions.

Read the page and start a run

  1. Open Runs and schedules.
  2. Read when each feature runs next and how its last run went. Click a row to open its card.
  3. In the open card, click Run now in a check's row, or Run all now for every included check.
  4. Scroll to Recent runs to read the result.

Check it worked: the check's row shows Running… and then its result, for example Today 06:00 · Done. Recent runs has a new line at the top.

  • A Failed row shows the reason in the Notes column. Look the message up in the error index.

What it does not do

  • It does not show a feature that is not built yet. You see the four features above.
  • It does not keep a schedule per check. One schedule per feature decides; see Schedules.
  • It does not show runs older than the latest 30.
  • It does not write to HubSpot from any run.

Why it works this way

A list of runs with honest numbers shows a problem early. Look for a run that scanned zero companies, a run that never finishes, or a rising count of collisions.

Common questions

What does Partly done mean? The run made some suggestions and then stopped with an error.

Why does Created differ from Scanned? Most companies are clean. Created counts only suggestions.

Why is Fixed in HubSpot not zero? People fixed domains by hand since the last run. See Items fixed in HubSpot.

Why does a run say Skipped: AI allowance used up? This month's AI allowance was used up when the run was due, so it did not start and nothing was sent. It names the day the allowance starts again; see AI allowance used up.

Why does a run say Skipped: paused? It was due while Askling was paused. It is not made up later.

Can I stop a run that is going? No, no button cancels a run. It ends by itself as Done, Partly done, Failed or Skipped. If one stays on Running for hours, tell Askling support the check and the start time.

Why does a run say Cancelled? Askling ended a run for the companies you added to Enrichment because another run was going, so nobody pressed a cancel button. The Notes column says Another run was going. Your companies wait for the next run.

What is Retry? The queue started the run again after a short HubSpot problem such as a timeout.

Where is the Setup run? Finishing Setup queues a first run. It shows as Setup.

When something goes wrong

SymptomCauseWhat to do
The settings of this check are not valid. Save them again.The check settings are brokenSee more on this message
The protection rules are not set up yet, so Askling cannot tell which companies are read only.The protection rules are missingSee more on this message
The run stopped unexpectedly. It was logged and can be started again.An unexpected problemRun again; see more on this message
A run fails because HubSpot asked Askling to slow downHubSpot limited the requestsRun again later. See more on this message
Stuck on RunningThe worker stoppedWait. If it stays, tell Askling support the check and the start time